Chaurasia, S S and Verma, S (2020) Strategic determinants of big data analytics in the aec sector: A multi-perspective framework. Construction Economics and Building, 20(04), 63-81.

Datta, A, Ninan, J and Sankaran, S (2020) 4D visualization to bridge the knowing-doing gap in megaprojects: An Australian case study. Construction Economics and Building, 20(04), 25-41.

Fahri, J, Pollack, J and Kolar, D (2020) Identifying success criteria at the post-handover stage for international development projects. Construction Economics and Building, 20(04), 103-119.

  • Type: Journal Article
  • Keywords: success criteria; post-handover stage; international development projects
  • ISBN/ISSN: 2204-9029
  • URL: https://doi.org/10.5130/AJCEB.v20i4.7289
  • Abstract:

    The question of how successful a project is beyond the handover stage is still echoing in the literature on project management and more magnified in international development (ID) projects. In addressing the question, this study aims to demonstrate the importance of time frame in assessing project success, particularly identifying the success criteria at the post-handover stages (outcome and impact stages). This study used a qualitative approach that was rooted in interpretivism, allowing the use of constructivist grounded theory method (CGTM) in an ID project as an example. The study identified eight success criteria: Convenience, Development, Documentation, Maintainability, New Capability, Price of Service or Product, Training, and Usability. The study also found that, first, each participant had different emphases on different success criteria; second, most of these success criteria were still under the outcome stage; and lastly, usability received the highest responses from the participants as the most concerned criterion at the post-handover stages. This last finding verified the importance of time frame where the other criteria became less important if the outputs were useful to deliver strategic objectives. Future studies that use more participants and different types of institution are also encouraged.

Fini, A A F and Forsythe, P (2020) Barriers to reusing and recycling office fit-out: an exploratory analysis of demolition processes and product features. Construction Economics and Building, 20(04), 42-62.

Latiff, A M A, Jaapar, A and Isa, C M M (2020) Project governance practices in urban public housing projects: A case study of public housing in Malaysia. Construction Economics and Building, 20(04), 120-36.

Livesey, P V (2020) Further insights by project managers into the problems in project management. Construction Economics and Building, 20(04), 137-53.

Nguyen, D M, Ding, G and Runeson, G (2020) Energy and economic analysis of environmental upgrading of existing office buildings. Construction Economics and Building, 20(04), 82-102.

Skitmore, M, Xiong, B, Xia, B, Masrom, A and Newton, S (2020) Relationship between contractor satisfaction and project management performance. Construction Economics and Building, 20(04), 1-24.